BenchK 700B wall bars

BenchK wall bars whit a steel frame and 9 solid beech rungs

Color: black

BenchK 700B wall bars

BenchK wall bars whit a steel frame and 9 solid beech rungs

689.00 $

-

Color: black

product-phone+48 536 560 089

Available

shipping

Dostawa Gratis

Wysyłka w 24h
payment

Bezpieczne płatności

Tylko sprawdzone metody

A wall bars made in Poland conforming to European safety standards PN-EN 12346:2001, PN-EN 913:2019-03 for gymnastic equipment.

BenchK 700 wall bars is a modern take on a classic wooden wall bars. By combining solid beech wood and steel we created a piece of sport furniture, that will perfectly fit into a modern interior.

The rungs are made of the highest quality beech wood. In order to keep the warmth and original texture of natural wood, the rungs made of solid beech wood, are not varnished but are hand-oiled with two layers of organic oil produced in Germany, based on linseed oil which is approved for contact with food.

Each oval slot in the steel profile has a plastic bush. Not only does it improve the aesthetics, but also protects the wooden rung. Each cuts and holes are made with a laser, which guarantees precision and ideal shape.

Assembly set is included (does not include wall mounting set, as its type depends on the type of wall which the wall bars will be attached to). The decision and responsibility for the method of installation of the wall bars rests with the customer. Wall mounting is not possible to a plasterboard wall. The minimum required wall thickness in the case of installation with the use of Fischer expansion bolts available from BenchK is 12 cm/4,7″. In all other cases, it is a recommended thickness only. For other wall fixings please see manufacturers recommendations.

For stud wall construction houses, it is required to use BenchK WHB+S8 or WHW+S8 wall holder for a wall bar to have it safely secured to the wall.

Both the colors of individual wooden elements and the colors in the images may differ slightly from those in reality due to the nature of the wood. Nevertheless, we make special efforts to keep these differences to a minimal.

The set includes: wall bars (gymnastic ladder)
Maximum user weight: 150 kg (330 lbs)
Width: 67 cm (26 3⁄8″)
Height: 240 cm (94 ½″)
Weight: 20kg (44 lbs)
Minimum installation height: 250 cm (98 ½″)
Mount type: to wall
Color: black matt
Material: steel, beech wood
Warranty for metal elements: 10 years
Warranty for other elements: 2 years

BenchK Series 7 wall bars assembly instructions

See / Download the manual

Akcesoria do produktu

BenchK B1B workout bench

BenchK rotatable workout bench with rollers for knee support and an additional seat
Color
865.00 $

-

Add to cart

BenchK PB3B steel pull up bar

BenchK convertible steel 6-grip pull-up bar that can also be used as a barbell holder
Color
549.00 $

-

Add to cart

Foldable gymnastic mattress – brown

Folding phthalate-free gymnastic mat, brown
Color
299.00 $

-

Add to cart

BenchK PB076 Wooden pull up bar in oak

BenchK adjustable wooden pull-up bar in oak for BenchK wall bars with a black steel frame
Color
279.00 $

-

Add to cart

BenchK PB2B steel pull up bar

BenchK fixed steel 6-grip pull-up bar
Color
379.00 $

-

Add to cart

Foldable gymnastic mattress – Gray

Folding phthalate-free gymnastic mat, gray
Color
299.00 $

-

Add to cart

BenchK DB1B Dip bar

BenchK dip bar with back support
Color
629.00 $

-

Add to cart

Free shipping to all states and street addresses
in the continental U.S.
(excluding Hawaii, Alaska, and U.S. protectorates)
is required


Safe
and protected shopping


Comprehensive
customer service